Skip To

  • Skip to content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    Digital rendering of proposed design, including pedestrian path leading up to the Trent River Crossing. Image by DTAH.

    You are here:

    • Home
    • Trent River Crossing (Campbellford Bridge) and Surrounding Road Network
    Go Back

    Reports and Documents

    Environmental Study

    • document icon Environmental Study Report (Feb 2016) (5.94 MB) (pdf)
    • document icon Environmental Study Report - Appendices 1 - 2 (August 2014) (39 MB) (pdf)
    • document icon Environmental Study Report - Appendix 3 (July 2012) (19.2 MB) (pdf)
    • document icon Environmental Study Report - Appendices 4 to 8 (Aug 2014) (37.5 MB) (pdf)
    • document icon Environmental Study Report - Appendices 9-10 and 12-13 (August 2014) (5.07 MB) (pdf)
    • document icon Environmental Study Report - Appendix 11 (August 2014) (37.7 MB) (pdf)
    • document icon Addendum - Expanded Environmental Noise Assessment Report (June 2013) (4.06 MB) (pdf)
    • document icon Addendum to the Environmental Study Report (Mar 2021) (12.3 MB) (pdf)
    • document icon Implementation Plan: Crossing & Arterial Road Network (Nov 2017) (5.26 MB) (pdf)

    Public Information Sessions

    • document icon Trent River Crossing Public Information Session (April 2023).pptx (3.94 MB) (pptx)
    • document icon Public Information Session Presentation (Summer 2020) (20.3 MB) (pdf)
    • document icon Trent-River-Crossing Virtual Q&A Session Presentation (20.3 MB) (pdf)
    • document icon Public Consultation Summary Report (Dec 2020) (22.2 MB) (pdf)
    • document icon Trent River Crossing Detailed Design Update (April 2023) (6.33 MB) (pdf)